SandJack TV
No Result
View All Result
  • Home
  • Football
  • Basketball
  • NFL
  • NBA
  • WNBA
  • Women’s Sports
  • Tennis
  • Boxing
  • Baseball
  • UFC
  • MMA
  • Netball
  • Racing
  • MORE
    • Athletics
    • Golf
    • Cycling
    • Formula 1
    • ESports
  • Home
  • Football
  • Basketball
  • NFL
  • NBA
  • WNBA
  • Women’s Sports
  • Tennis
  • Boxing
  • Baseball
  • UFC
  • MMA
  • Netball
  • Racing
  • MORE
    • Athletics
    • Golf
    • Cycling
    • Formula 1
    • ESports
No Result
View All Result
SandJack TV
No Result
View All Result
Home Golf

Hye-Jin Choi maintains tournament-long lead at LPGA Malaysia

November 1, 2025
in Golf
Reading Time: 2 mins read
0 0
A A
0
Hye-Jin Choi maintains tournament-long lead at LPGA Malaysia
Share on FacebookShare on Twitter

[ad_1]

KUALA LUMPUR, Malaysia — Maintaining the lead she has held since the opening round and looking for her first win on the LPGA Tour, Hye-Jin Choi will take a four-stroke advantage into the final round of the Maybank Championship after shooting a 5-under 67 on Saturday.

Choi, who played on the South Korea team in last week’s International Crown, had a 54-hole total of 19-under 197 on the Kuala Lumpur Golf and Country Club course. She started the day with a five-stroke lead.

The 26-year-old Choi has 28 career top-10 finishes and placed second at the 2017 U.S. Women’s Open as a 17-year-old amateur.

It is the first time in her career she has led after the first three rounds of play and the third time she has led a tournament heading into the final round. The previous two times she finished runner-up.

“I’ve been waiting for this a really long [time], and I’m going to try my best tomorrow,” Choi said. “I think I will feel like I’m making the dream and I just imagine on it. I’m just looking for a victory tomorrow.”

China’s Liu Yan (65) was in second place after a bogey-free round, and Hannah Green, a member of the winning Australia team at the International Crown last weekend, was in third after a 67, four strokes behind Choi.

A Lim Kim was the biggest mover with a 64 that left her in a tie for fourth place, six strokes off the lead. Kim’s round included an eagle on No. 18 and six birdies.

“It was a great shot, but improbable,” Kim said of her 25-foot eagle putt on No. 18. She started her round with four birdies in five holes.

World No. 1 Jeeno Thitikul, a runner-up in Malaysia the past two years, shot 65 and was also tied for fourth. She birdied her last three holes Saturday.

“I don’t know what’s going on, but it’s good,” said Thitikul. She credited her many fans in the gallery for their support, saying again the venue was like a “mini-Thailand” for her.

Defending champion Yin Ruoning shot 69 and was in seventh place, seven strokes behind Choi and tied with New Zealander Lydia Ko (68). Brooke Henderson shot 68 and was 11 strokes behind.

Next week, the LPGA ends its five-week Asian swing with the Japan Classic at Shiga.

[ad_2]

Source link

Share this:

  • Email a link to a friend (Opens in new window) Email
  • Share on X (Opens in new window) X
  • Share on Facebook (Opens in new window) Facebook
  • Share on Tumblr (Opens in new window) Tumblr
  • Share on LinkedIn (Opens in new window) LinkedIn
  • Share on Pinterest (Opens in new window) Pinterest
  • Share on Reddit (Opens in new window) Reddit
  • Share on WhatsApp (Opens in new window) WhatsApp

Like this:

Like Loading…

Related

Tags: ChoiHyeJinleadLPGAMaintainsMalaysiatournamentlong
Previous Post

rewrite this title What happened on fateful Game 6 play as Blue Jays waste World Series chance

Next Post

Mercury Trio Gearing Up For Unrivaled Season

Related Posts

Vokey WedgeWorks Finally Gets It (Mostly) Right
Golf

Vokey WedgeWorks Finally Gets It (Mostly) Right

March 27, 2026
Waring leads, Woodland 1 back at PGA Tour’s Houston Open
Golf

Waring leads, Woodland 1 back at PGA Tour’s Houston Open

March 26, 2026
The TaylorMade SYSTM2 Putters Deliver Performance And Affordability
Golf

The TaylorMade SYSTM2 Putters Deliver Performance And Affordability

March 26, 2026
How to bet the Texas Children’s Houston Open: Best bets, DFS tips and more
Golf

How to bet the Texas Children’s Houston Open: Best bets, DFS tips and more

March 25, 2026
Long And Accurate: Four 2026 Drivers That Don’t Make You Choose
Golf

Long And Accurate: Four 2026 Drivers That Don’t Make You Choose

March 25, 2026
Wilson Golf introduces new premium stand bag – Golf News
Golf

Wilson Golf introduces new premium stand bag – Golf News

March 25, 2026
Next Post
Mercury Trio Gearing Up For Unrivaled Season

Mercury Trio Gearing Up For Unrivaled Season

Gervonta Davis – Jake Paul May Be Canceled Due To Kidnapping, Assault, And Aggravated Battery Accusations Against Davis.

Gervonta Davis - Jake Paul May Be Canceled Due To Kidnapping, Assault, And Aggravated Battery Accusations Against Davis.

No Result
View All Result
  • Trending
  • Comments
  • Latest
2026 Tracksmith Boston Collection Released

2026 Tracksmith Boston Collection Released

March 2, 2026
LoLdle answers today

LoLdle answers today

March 2, 2026
2026 Los Angeles Marathon Recap

2026 Los Angeles Marathon Recap

March 12, 2026
Warriors, Cavs, Mavs Expected To Pursue LeBron James In 2026

Warriors, Cavs, Mavs Expected To Pursue LeBron James In 2026

August 8, 2025
Euro 2024: Slovakia v Romania

Euro 2024: Slovakia v Romania

0
Manchester United target Khvicha Kvaratskhelia close to joining Paris Saint-Germain – Man United News And Transfer News

Manchester United target Khvicha Kvaratskhelia close to joining Paris Saint-Germain – Man United News And Transfer News

0
The Phillies Lock up Another Part of Their League-Best Rotation

The Phillies Lock up Another Part of Their League-Best Rotation

0
DeMar DeRozan’s Future at Bulls in Doubt: Report

DeMar DeRozan’s Future at Bulls in Doubt: Report

0
The Mercury’s Team Effort Helps Them Keep Playoff Streak Alive

The Mercury’s Team Effort Helps Them Keep Playoff Streak Alive

March 28, 2026
Volta a Catalunya stage 6 LIVE: Jonas Vingegaard caught in split with all GC rivals in lead group

Volta a Catalunya stage 6 LIVE: Jonas Vingegaard caught in split with all GC rivals in lead group

March 28, 2026
Another Pole For Kimi Antonelli In Japan

Another Pole For Kimi Antonelli In Japan

March 28, 2026
London City boss Maestre expecting tough game against ‘dangerous’ West Ham

London City boss Maestre expecting tough game against ‘dangerous’ West Ham

March 28, 2026
  • About Us
  • Advertise with Us
  • Disclaimer
  • Privacy Policy
  • DMCA
  • Cookie Privacy Policy
  • Terms and Conditions
  • Contact Us
SAND JACK TV

Copyright © 2024 Sand Jack TV.
Sand Jack TV is not responsible for the content of external sites.

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • Home
  • Football
  • Basketball
  • NFL
  • NBA
  • WNBA
  • Women’s Sports
  • Tennis
  • Boxing
  • Baseball
  • UFC
  • MMA
  • Netball
  • Racing
  • MORE
    • Athletics
    • Golf
    • Cycling
    • Formula 1
    • ESports

Copyright © 2024 Sand Jack TV.
Sand Jack TV is not responsible for the content of external sites.

%d